Capacity Expansion Data

Capacity Expansion Data

Units

Power - MW Energy - MWh lengths - km

Setup for each model

folder-name: [region]-[nodes] subfolder: TS - containing time-series-data [dependency].csv |Timestamp| [nodes...]| |–––-|––––| |[some iterator]| relative value of installed capacity for renewables or absolute values for demand or so| |...| ...|

capcosts.csv, fixcosts.csv, var_costs.csv

tech[currency][LCA-Impact categories...]
[techs]Cost per unit Power(MW) or Energy (MWh)Emissions per unit Power(MW) or Energy (MWh)...
.........

nodes.csv

nodesregioninfrastruct[techs...]
[nodes...]region of this nodeex for existing or limit for limiting capacityinstalled capacity of each tech at this node
.........

techs.csv

techcategsector`fueleff_ineff_outmax_gradienttime_serieslifetimefinancial_lifetimediscount_rate
[techs...]function handeling thoseel for electricityfuel dependencyefficiency in for storageefficiency out for storagemax gradient of this technologytime-series dependency of this techlifetime of an installed captime in which you have to pay back your loandiscount_rate

lines.csv

|lines|node_start|node_end|reactance|resistance|power|voltage|circuits|length| |[lines...]|node where line starts| node where line ends| reactance| resistance| max power| voltage or description| number of circuits included| length in km|

GER_1

Germany one node, with existing infrastructure of year 2015, no nuclear

Time Series

Installed CAP

nodes

Cost Data

General

cap_costs

fix_costs

var_costs

LCIA Recipe H Midpoint, GWP 100a

Other

GER_18

Germany 18 (dena) nodes, with existing infrastructure of year 2015, no nuclear

Time Series

Installed CAP

nodes

lines

Cost Data

cap_costs

fix_costs

var_costs

LCIA Recipe H Midpoint, GWP 100a

Other

length not correct yet demand split up needs improvement

CA_1

California one node

Time Series

Installed CAP

nodes

lines

limits

Cost Data

General

cap_costs

fix_costs

var_costs

LCIA Recipe H Midpoint, GWP 100a

Other

CA_14

Implementation
'CA_14' is currently not included in the published data. It will follow shortly.

California multiple node

Time Series

Installed CAP

nodes

lines

limits

Cost Data

cap_costs

fix_costs

var_costs

LCIA Recipe H Midpoint, GWP 100a

Other

TX_1

Texas as one node, no existing capacity

Data from Merrick et al. 2016

Implemented with PV-price 0.5 /W fix: 2.388E+3 /MW cap: 5.16E+5 /MW

Alternatively for price of 1.0/W edit .csv files and replace costs with fix: 4.776E+3 /MW cap: 1.032E+6 /MW

Assuptions for transformation: demand mulitiplied with 1.48 solar devided by 1000